A ‘fabric first’ approach to building design involves maximising the performance of the components and materials that make up the building fabric itself, before considering the use of mechanical or electrical building services systems. This can help reduce capital and operational costs, improve energy efficiency and reduce carbon emissions. A fabric first method can also reduce the need for maintenance during the building’s life.
Buildings designed and constructed using the fabric first approach aim to minimise the need for energy consumption through methods such as:
- Maximising air-tightness.
- Using Super-high insulation.
- Optimising solar gain through the provision of openings and shading.
- Optimising natural ventilation.
- Using the thermal mass of the building fabric.
- Using energy from occupants, electronic devices, cookers and so on.
Focussing on the building fabric first, is generally considered to be more sustainable than relying on energy saving technology, or renewable energy generation, which can be expensive, can have a high embodied energy and may or may not be used efficiently by the consumer.
Having energy efficiency integrated into the building envelope can mean occupants are required to do less to operate their building and not have to adjust their habits or learn about new technologies. This can result in less reliance on the end user regarding the buildings energy efficiency.
Fabric first building systems can be constructed off site, resulting in higher quality and so better performance, reduced labour costs and an increased speed of build.
The government’s approach to zero carbon homes and zero carbon non-domestic buildings adopted the fabric first approach. Developers would have been required first to avoid or mitigate regulated emissions by using on-site energy efficiency measures (such as insulation and low energy heating systems) to achieve a minimum Fabric Energy Efficiency Standards, then to adopt on-site zero carbon technologies (such as solar panels) and finally to use off-site measures to deal with any remaining emissions.
Passivhaus, an energy performance standard for dwellings, commercial, industrial and public buildings, also adopts a fabric-first approach to energy efficiency.
[edit] Related articles on Designing Buildings
- Achieving net zero in social housing.
- Active House.
- Allowable solutions.
- Applying Fabric First principles: Complying with UK energy efficiency requirements FB 80.
- Carbon ratings for buildings.
- CIOB holds net zero event with industry experts and UK Government.
- Code for sustainable homes.
- Fabric first investigation into net zero for existing buildings.
- Fabric first will safeguard heat decarbonisation.
- Passivhaus.
- Passive building design.
- Retrofit.
- Thermal bridging and the Future Homes Standard.
- Zero carbon homes.
- Zero carbon non-domestic buildings.
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.